When connecting your property, it is recommended that you obtain more than one quote. To connect to our water or sewerage system, please fill in the relevant application form/s and submit them to South Gippsland Water (one form per allotment, unit or occupancy). Charges for connection will apply.

Property Connection Charges (Tariffs & Prices)
Application to connect to water and sewer
Application to Disconnect from water

Connection assembly diagrams

South Gippsland Water has developed diagrams for typical high, medium and low risk meter installations for fire service and/or general water supply connections. Download the Connection Assembly Diagrams below:

High Risk Connection
Medium Risk Connection
Low Risk Connection

Other connection diagrams available are:
80mm+ Fire & General Service Combined Residential Commercial Industrial
80mm+ Fire Hydrant Hose Reels with Double Check Detector Assembly
Fire sprinkler and hydrant service 80mm+ meter configuration
Tapping Configurations

Information for plumbers

For technical advice, call the Victorian Building Association on 1300 815 127 or a design/hydraulic consultant.

We can help you with connection applications, quotes, connection standards/requirements, the issuing of plumbing consent numbers, and provide field notes of asset and connection locations.

The ‘General Installation Notes’ (below) details our tapping, property service installation, excavation and meter assembly requirements.

Property drainage plans (as constructed plans) are available for most properties in our service area connected to sewer mains. These plans give details on the location of sewer drains within the property boundary and are normally requested by plumbers fixing sewer blockages and for customers planning extensions/renovations.

As constructed plans

In accordance with the Building Act 1993, plumbers are required to supply “as constructed” information for all sewer works carried out within the South Gippsland Water catchment area, which require the issue of a PIC number within 14 days of the completion of work.

We will supply an “as constructed” form for use when the Application to Connect has been lodged and a PIC number allocated.

Pressure & flow

To apply for a water pressure and flow test, please download the application form and submit it to us with the relevant fee.